Thesis
No | Authors | Title | Degree | Institute | Location | Date |
---|---|---|---|---|---|---|
23 | Sangwoon Lim | Ship Stowage Planning and Scheduling Algorithm for the Steel Coil Products | Master | Artificial Intelligence, POSTECH | Pohang, Korea | Aug 2024 |
22 | Jonghwa Lee | Optimization of Long-Term Production Planning for the Shipbuilding Industry | Ph. D. | Industrial & Management Engineering, POSTECH | Pohang, Korea | Feb 2024 |
21 | Hyunjoon Kim | The Multi-Profit Orienteering Problem and Its Variants | Ph.D. | Industrial & Management Engineering, POSTECH | Pohang, Korea | Feb 2022 |
20 | Jaesang Park | Optimization Problems for the Large-scale Courier Industry: Quarterly Logical Network Design and Daily Transportation | Ph. D. | Industrial & Management Engineering, POSTECH | Pohang, Korea | Feb 2021 |
19 | Myungeun Eom | Integrated Transfer Planning and Scheduling for the Material Blending Production System | Master | Industrial & Management Engineering, POSTECH | Pohang, Korea | Aug 2020 |
18 | Yoojin Na | Project Scheduling with Time-Varying Resource Capacities and Generalized Relations | Master | Industrial & Management Engineering, POSTECH | Pohang, Korea | Aug 2020 |
17 | Youngmin Ki | Routing Control for Automated Highway Systems | Ph. D. | Industrial & Management Engineering, POSTECH | Pohang, Korea | Aug 2019 |
16 | Dong-jin Noh | Statistical Nested Partitions Method towards Global Optimization | Ph. D. | Industrial & Management Engineering, POSTECH | Pohang, Korea | Feb 2018 |
15 | Onyu Yu | Mathematical Modeling and Heuristic Algorithms for Split Delivery Ship Routing Problem with Time Windows | Master | Industrial & Management Engineering, POSTECH | Pohang, Korea | June 2017 |
14 | Hyunchul Tae | Fair Cost Allocation in the Vehicle Routing Game | Ph. D. | Industrial & Management Engineering, POSTECH | Pohang, Korea | August 2015 |
13 | Jongsung Lee | A Production and Delivery Problem Considering Half-life of a Nuclear Medicine | Ph. D. | Industrial & Management Engineering Department, POSTECH | Pohang, Korea | Feb 2015 |
12 | Byeongmok Kim | Waiting Strategy for the Dynamic Pickup and Delivery Problem with Time Windows in the Food Delivery Agency Industry | Master | Industrial & Management Engineering Department, POSTECH | Pohang, Korea | Feb 2015 |
11 | Giho Lee | System Design for Real-life Vehicle Routing Problems with Consideration of Districts | Master | Industrial & Management Engineering Department, POSTECH | Pohang, Korea | Feb 2015 |
10 | Hong Li | Solution Approaches for the Team Orienteering Problem | Master | Industrial & Management Engineering, POSTECH | Pohang, Korea | June 2013 |
09 | J. Koo | High-rise Building Evacuation Problem with Heterogeneous Population including the Disabled | Ph. D. | Industrial & Management Engineering Department, POSTECH | Pohang, Korea | May 2013 |
08 | J. Wy | The Rollon-Rolloff Vehicle Routing Problems in the Waste Management | Ph. D. | Industrial & Management Engineering Department, POSTECH | Pohang, Korea | May 2013 |
07 | J. Park | The School Bus Routing Problem: Problem Characteristics and Algorithms | Ph. D. | Industrial & Management Engineering Department, POSTECH | Pohang, Korea | December 2010 |
06 | Y. Jun | Heuristic Algorithms for the Vehicle Routing Problem with Simultaneous Pickup and Delivery | Master | Industrial & Management Engineering Department, POSTECH | Pohang, Korea | December 2009 |
05 | S. Son | A Particle Swarm Optimization Algorithm with Relation Matrix for Capacitated Vehicle Routing Problem | Master | Industrial & Management Engineering Department, POSTECH | Pohang, Korea | December 2009 |
04 | S. Jeong | Development of Generic Simulation Models for Logistics Embedded Manufacturing Systems | Master | Industrial & Management Engineering Department, POSTECH | Pohang, Korea | December 2007 |
03 | J. Shin | Reassignment-based OHT Dispatching Rules for Semiconductor FAB Lin | Master | Industrial & Management Engineering Department, POSTECH | Pohang, Korea | December 2007 |
02 | B. Kim | Intelligent Agent Based Planning, Scheduling, and Control: Warehouse Management Application | Ph. D. | Decision Sciences and Engineering Systems, Rensselaer Polytechnic Institute | Troy, New York | May 2002 |
01 | B. Kim | 3D Parametric Design Using Orthograpic Views | Master | Industrial Engineering Department, Pohang University of Science & Technology | Pohang, Korea | August 1994 |